just slowly inching toward the "shop" area.
2 major things are planned for the first go-around:
repair some body mount failures(front of "the tub").
install front locker.
the tub is collapsing onto the mounting points, so suzi is wanting to flex at the firewall and door pillars. so far it's just effecting the door alignments. mabe i can flex it back level.
got the locker today, and some recommended transmission/transfer case mounts, so i can remove the straps that are holding her together.
also gonna upgrade a replacement r drag link.
fordyce was brutal.


'89 kick w/some modifications.
some intentional.
suzi the psychic gets me fishing.
kj6esv